Guangdong has abundant potential water power resources of
some 10,730 megawatts, among which, 6,660 megawatts can be
tapped. The past 50 years have seen the construction of 6,000
hydropower stations with a total installation capacity of
4,012 megawatts. Among them some are large or medium sized
stations such as Xinfengjiang, Fengshuba and Liuxihe. Especially
since the reform and open, small sized hydropower plants have
also been developed rapidly dependent on execution of the
adopted motion and special policy set for promotion of the
small hydropower plants, that the people shall benefit from
it who built and took care of it. Consequently, the installation
capacity of the small hydropower plants has amounted 2,870
megawatts, taking up 71.5% of the total in Guangdong. 33 electrification
counties have primarily reached the electrified standards,
which have been checked and accepted in 3 batches respectively.
By construction of the small hydropower plants, economic development
in the mountainous areas have been promoted drastically.
|