The past 50 years since the founding of the new China, especially the past two decades since implementation of the reform and open policy, have witnessed vigorous growth in the water resources sector in Guangdong. Under the leadership of the Communist Party of China (CPC) and the people's government, tremendous achievements have been scored. A large number of water conservancy projects have been built by means of multipurpose development in line with the local conditions, which were invested by the local people and subsidized by the state, forming a multifunction system that serves flood control, prevention of storm surge, drainage, irrigation, power generation, water supply and prevention of salinity intrusion. Since the founding of the new China, a total of 49.74 billion yuan has been invested into the water resources sector in Guangdong. The projects being built are shown as follows:

1. Reservoirs
Sized Number Storage capacity
(in billion m3)
Large 29 25.23
Medium 274 7.4
Small 6,238 5.462
Total 6,435 38.1

2. Sluice Gates
Sized Number
Large 87
Medium 292
Small 4,969
Total 5,348


3. Total installed capacity of electric pumping stations: 1,410 megawatts;

4. Diversion works: 54,318 sets with a total diversion capacity of 1,594. M3/s;

5. Numerous seashore dikes and river levees: totally more than 15,900 kilometers long, among which 354 are those protecting farmlands over 10,000 mu (15 mu = 1 hectare) with a total length of 6,521 kilometers;

6. Hydropower stations: totally installed capacity of 4,012 megawatts, among which 2,870 megawatts are of small-sized generators;

7. Irrigation wells dug: 6,623


Being completion and beneficial results of such projects, under control are floods, draughts, salinization and water logging. The days are gone forever when heavy rain resulted in disastrous consequences, ordinary raining caused flooding, and lasting fine days made draught. In addition to sufficient water supply by these projects for the national economy and social development in Guangdong, the public is guaranteed free from flood threat. The great achievements have been providing a favorable condition for production and investment in Guangdong, contributing a lot to the steady, continuous and coordinated development both in economic and social sectors.